A home builder, drywall crew or concrete outfit sends one request and partners take it from there.
Wheatland Finance in Bullhead City, Arizona explains how builders and trade contractors can fund crews, materials, draw gaps and machines, with Mohave County construction counts.
At a glance
- Construction establishments with paid employees, Mohave County, AZ (NAICS 23)
672 in 2023 (CBP)
- Construction establishments with fewer than five employees
405 of 672, or 60.3% (CBP 2023)
- New housing units authorized by building permits, Mohave County, AZ
2,543 in 2024; 1,817 in 2025 (Census BPS)
- Construction businesses without paid employees, Mohave County, AZ
1,878 (Nonemployer Statistics 2024)
How Mohave County, AZ contractors pay for framing crews, lumber orders and draw delays
A framing contractor pays three bills before a builder pays it: the crew every two weeks, the lumber yard on its terms, and the carrying cost of a draw that arrives late. Each one has its own fit. Payroll during a delayed draw fits a revolving line or working capital; a lumber package fits a line drawn for the job and repaid when the draw lands; a late draw itself is the reason the line exists.
Illustration only, invented figures: a framer with a $14,600 biweekly payroll waits 30 days past the expected draw date. That wait holds 2 or 3 paydays, depending on the calendar, so $29,200 to $43,800 of payroll must be met before the draw comes in.
A worked example in the article on how Bullhead City, AZ builders and finish contractors fund crews and equipment (contractor financing) prices a compact excavator, a crew's payroll wait and three material draws.
Planning framing crews, lumber orders and draw delays as one of the Mohave County, AZ contractors
The contractors in Mohave County, AZ are a large and mostly small group. County Business Patterns counted 672 construction establishments with paid employees in 2023 (NAICS 23), and 405 of them (60.3%) had fewer than five employees. Specialty trade contractors made up 476 of the 672 (NAICS 238) and builders 172 (NAICS 236); by our arithmetic the remaining 24 were heavy and civil engineering contractors (NAICS 237).
Housing permits give a sense of the volume. Census building permit data show 2,241 new housing units authorized in the county in 2023, 2,543 in 2024 and 1,817 in 2025; single-family homes accounted for 1,706 of the 2025 units. Each permitted house is a framing package, a slab and a run of finish work for someone in the trades.
Nonemployer Statistics counted 1,878 construction businesses with no paid employees in the county for 2024, a separate program from the employer count above.
Funding framing crews, lumber orders and draw delays in Bullhead City, AZ
A line of credit carries a lumber package from delivery to draw. Illustration only, invented figures: a $38,000 lumber order drawn on a line at an annual rate of 12% and paid off 45 days later costs about $562.19 in interest. If the draw comes later, the interest runs longer; nothing else about the line changes.
Working capital fits a one-time stretch, for example taking on a second crew for a larger tract before the first draws from it arrive. A partner reading either request wants the builder contracts, the draw schedule, bank statements and the payroll register.
Drywall and finish crews face the same pattern on a smaller scale: the county had 115 building finishing contractors with paid employees in 2023 (CBP, NAICS 2383), and 71 of them had fewer than five.
Framing Crews, Lumber Orders and Draw Delays near Bullhead City, AZ: loan or lease?
Crews and lumber cannot be leased, so for these three costs the real choice is between a revolving line and a fixed loan. The line suits costs that come and go with each house; the fixed loan suits a single step up, such as hiring and equipping a second crew.
Leasing enters only for the crew's equipment: a telehandler, a forklift for the yard, a trailer of framing nailers and compressors. Equipment financing or a lease on those items keeps them off the line, which then stays open for lumber and payroll.
Keep the two apart on the request as well: one line for the machines, with their quotes, and one for the revolving need, with the draw schedule. A partner can then price each part on its own record.
Slab work has its own equipment needs. Poured concrete foundation and structure contractors numbered 38 with paid employees in the county in 2023 (CBP, NAICS 238110), each with pumps, screeds and forms to pay for.
How Mohave County, AZ contractors pay for skid steers, dump trailers and bid bonds
Illustration only, invented figures: a site-work contractor finances a $64,000 skid steer and a $14,500 dump trailer together, $78,500 over 60 months at an annual rate of 9.75%: $1,658.25 a month. A machine bought used costs less, and a partner may set a shorter term to match its age.
A bid bond is not a loan. It comes from a surety, which reads the contractor's financial statements, bank balances and work in progress before it issues one. What funding can do is strengthen those statements: equipment bought on its own financing leaves cash in the bank, and a line that is not drawn to its limit shows room to carry a job.